An expansion that brings the plant’s total capacity to 266.18 kW. In Cerano, uSolar has integrated a new photovoltaic section into the system already present at a site in the chemical-industrial sector.
Power
Context
Location
The existing section of 111.32 kW is complemented by a new section of 154.86 kW, composed of 356 Hyundai modules and managed using SolarEdge technology. The complete system comprises 840 modules.
The project connects the already installed part to the new section, which includes 196 optimizers and two SolarEdge inverters, distributed on the site’s roofs.
Existing section
111.32 kW
New section
154.86 kW · 356 Hyundai modules
Overall modules
840
New section of inverters
2 SolarEdge
Optimizers new section
196 SolarEdge
Supports
Stainless steel and aluminum
Tell us about your building, its activities and energy needs. We’ll start with these elements to evaluate the project.
We use cookies to improve your experience on our site. By using our site, you consent to the use of cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper functioning of the website.
These cookies are required for adding comments to this website.
Statistics cookies collect information anonymously. This information helps us to understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyses website traffic for informed marketing decisions.
Service URL: policies.google.com (opens in a new window)
Puoi trovare maggiori informazioni nella nostra Privacy Policy and in our Privacy Policy.