Photovoltaic roofing for parking with a car and a charging point

Parking lots that produce energy

Photovoltaic carport for companies. Parking time becomes energy.

Parking space coverage, photovoltaic production and charging can become a single project. We design corporate carports that respect the daily use of the parking area and integrate with the site’s electrical system.

A complete vision

More functions. A coordinated project.

An effective carport starts with the movements of people and vehicles. We study parking spaces, lanes, access points, and heights together with structure, water collection, and electrical distribution. The photovoltaic power is sized based on the usable surface area; charging is based on the needs of those parking there.

01

Roofing and functionality

A structure to be integrated into the parking lot, with dimensions and routes designed for activity.

02

Photovoltaic production

Energy to be used on the site, considering exposure, shade and consumption profile.

03

Charging and management

AC or DC points, load control and access management to be chosen based on the service.

Spaces, components, relationships

Parking as an energy infrastructure.

Structures and foundations require specific checks. The layout must leave space for maneuvering, maintenance, pedestrian paths, and electrical connections. The provision for charging can also be made for subsequent phases, when defined in the project.

Functional layout: dimensions, structural checks and positioning are defined for the site.

Corporate photovoltaic carportSpatial diagram, not to scale. Roofing with modules, columns and foundations, parking spaces and routes, an electrical switchboard and a charging point. Dimensions, vehicle circulation, drainage and structural checks require a site-specific design. INDUSTRIAL INFRASTRUCTURERoofing, parking, energyPV roofingParking spaces and routesChargingand switchboard

Different needs, targeted choices

Each parking lot has a different way of working.

01

Employees and management offices

Long parking periods compatible with AC charging and power programming. Accesses and sessions can be associated with users or cards.

02

Customers and accommodation facilities

The duration of the visit, the number of users, and the desired service guide the choice between AC and DC. Payment management and reporting are defined with the chosen platform.

03

Corporate fleets

Return times, energy requirements, and expected departures guide priorities and planning. A BESS is evaluated if it meets a specific need at the site.

Required energy and average power for ten vehiclesScenario: Ten vehicles require 20 kWh each, a total of 200 kWh for the batteries. Over 8 hours, the average is 25 kW. The rectangular area represents this theoretical balance, not a measured profile or a promised power. Losses, vehicle availability, and solar quota to be verified. DIMENSIONING SCENARIOParking time gives energy time10 vehicles20 kWh each200 kWh ÷ 8 hours25 kW average0 h4 hours8 hEnergy in the vehicle's battery

How the system is coordinated

Calculate how much energy is needed and how much time you have.

A long break provides room to distribute the charging over time. This allows vehicles to be coordinated with the loads in the building and, when available, with the solar production. The nominal power of the charging stations does not match the power that all vehicles must absorb simultaneously.

Dimensioning scenario: 10 × 20 kWh ÷ 8 hours = 25 kW average delivered to the vehicle batteries. The actual draw takes into account losses and the availability of vehicles; the solar share depends on actual production. This is not a guaranteed performance.

The uSolar method

From the parking lot to the complete system.

01

Analysis of the area

Survey of parking spaces, access points, solar exposure and technical constraints of the parking lot.

02

Consumption and usage

Reading the site requirements and the parking and charging profiles.

03

Structure and system

Coordinated sizing of the roofing, photovoltaic systems and electrical infrastructure.

04

Technical definition

Selection of components, energy management and activities necessary for implementation.

05

Installation

Coordination of the construction site and the construction of the structure and the system.

06

Maintenance

Scheduling inspections of the photovoltaic system and any charging infrastructure, according to the agreed service.

Why uSolar

Space, energy and mobility. We design them together.

We assist the company in choosing a solution that is consistent with the parking area and its consumption. A single technical path coordinates the structure, photovoltaic system and possible charging, immediately clarifying the planned activities and the development possibilities.

Parking with photovoltaic shelters and covered parking spaces

Before you start

Answers to the most frequently asked questions.

The points to clarify to choose the path that best suits your project.

The carport can also be designed without charging. The potential need for equipment or arrangements should be verified in relation to the project and the applicable regulations. In any case, a setup for future developments can be considered.

It depends on the vehicles and the length of the stop. AC is often suitable for long stops; DC can be useful when shorter times are needed and the vehicles support it. Available power, budget, and usage drive the choice.

Not necessarily. Production varies with weather, season, and time of day. The grid can supplement the needs; a management system regulates the sessions and, if included, coordinates battery storage.

Yes, by choosing charging stations and platforms compatible with the required functions. RFID tags, session reports and payments, even via POS where provided for in the solution, must be defined together with the infrastructure.

It is necessary to verify spaces, underground utilities, the condition of the ground, foundations, structural loads, and site constraints. Water management and circulation are also part of the project.

We give your parking a new role.

We start from the area, the number of parking spaces and who uses them. We build a configuration that is consistent with today’s business and with the needs you want to meet.

×