News · In-depth analysis

Ten mistakes to avoid when choosing photovoltaic power generation

Choosing a photovoltaic system means comparing a project with the responsibilities that come with it. The most costly mistakes often stem from incomplete information, rather than from the individual component: here are ten useful questions before signing the contract.

Published on May 4, 2026

Two people examine a photovoltaic project and the arrangement of the panels on a roof. Original uSolar logo at the bottom right.

01 / In Depth

1. Start with panels instead of consumption

The size of the tag should be linked to the uses and schedules of the building. Annual consumption is useful, but it does not describe the coincidence with production. Before choosing, ask what data support the proposal and what future developments have only been hypothesized.

02 / In Depth

2. Compare prices with different ranges

An offer may include electrical works, practices or access that another excludes. The lowest price does not automatically demonstrate lower quality; however, it is necessary to verify that the comparison concerns the same activities and that the remaining items to be defined are recognizable.

The scheme

Three checks before signing

A proposal should be evaluated based on data, scope, and responsibilities.

01

Data and verifiable assumptions

02

Works and explicit exclusions

03

Clear responsibilities and assistance

04

Conscious decision

Guideline checklist, not a comparison between brands.

03 / In-depth analysis

3. Consider the already verified ceiling

A photograph does not certify the structure, stratigraphy, or suitability of the fasteners. Ask how the condition of the cover, accessibility, and possible interference will be evaluated. Any preliminary work must appear in the project plan, without being discovered when the components are already ordered.

04 / In Depth

4. Confusing production with savings

The kWh produced are not all avoided consumption. A portion can be fed into the grid and valued under different conditions. An economic estimate should make self-consumption explicit, pricing used, costs and assumptions, without turning a simulation into a guarantee.

05 / In-depth

5. Believing that a battery is always necessary

The energy storage should be evaluated based on the available surplus and subsequent consumption. A high capacity does not automatically compensate for insufficient production nor ensure autonomy. Power, compatibility, and operational objectives must also be clarified in the proposal.

06 / In Depth

6. Interpreting a guarantee as universal coverage

Product warranty, module performance, assistance and insurance coverage have different parameters. Check the duration, the responsible party, the conditions, exclusions and the request process. The word "warranty" alone does not explain what costs will actually be covered.

07 / In Depth

7. Ignoring the connection

The installation of the modules and the activation of the system do not necessarily coincide. The process with the network operator may require documents, approvals, and work. Ask what steps are included and which depend on entities or external conditions beyond the installation.

08 / In Depth

8. Not clarifying the subsequent management

Access to monitoring, final documents, and a reference for assistance must be understandable. Do not assume that maintenance that is never described in the offer is included. It is useful to know what checks are planned and how to report an anomaly after startup.

09 / In Depth

9. Copy the solution of the neighbor

Two similar buildings can have different shades, consumption patterns, and infrastructure. Hypothetical example: a house occupied during the day and one used mainly in the evening can consume the same energy, but require different assessments of coincidence and energy storage.

10 / Further reading

10. Signing without resolving important issues

Before making a decision, gather in a single discussion works that are included, exclusions, energy assumptions, payments, and responsibilities. A clear proposal does not eliminate every unforeseen event, but allows one to distinguish what is defined from what still requires verification.

Before signing, try to summarize the proposal in a few paragraphs: why that configuration was chosen, what works it includes, and who will follow the next steps. If an answer remains vague, ask for it to be clarified in the document, not just verbally.

The most frequently asked questions

Not necessarily. What matters is the adequacy of the solution and the clarity of the overall offer.

It is a forecast based on assumptions; any guarantees must be defined separately in the contract.

Bills and usage profile, together with information about the building, help to initiate a concrete discussion.

×