News / Industrial photovoltaic
GUIDES / COMPANIES

Photovoltaic on a warehouse: from the potential of the roofs to the project

The SNPA 2026 Report highlights the potential of Italian roofing systems. For those who manage a warehouse, the practical step is to understand how much of that potential can become a system useful for their business. The answer stems from the interaction between the building, consumption, and connection.

Guide for companies ·

Covering a production building with photovoltaic modules, skylights and technical spaces.

Before leaving, three things to keep in mind

01

The national estimate describes a possibility, to be verified on a case-by-case basis.

02

The available space must be considered in conjunction with structure, safety, and the electrical system.

03

Consumption over time and connection are needed to compare the configurations before the offer is offered.

01 / THE GUIDE

What the national data really say

140–193 GW

Residual national potential on roofs.
Source: SNPA, Report 50/2026, p. 319.

The SNPA 2026 Report on land consumption, published in October, estimates a potential residual photovoltaic capacity on Italian rooftops to be between 140 and 193 GW. These are power values: they do not indicate the energy produced in a year, or the installed capacity or the surfaces immediately usable.

The calculation excludes the central areas identified using OMI data and applies reductions to the building area. It assumes flat roofs, approximately 5 m² of panels per kW, modules with an efficiency of around 20%, and a proportion of roofs already occupied by photovoltaic panels of approximately 16%. These are national assumptions, not sizing parameters for a single shed.

Note 72 also clarifies a refinement of the method: unused spaces were already considered in the reductions. Using a parameter that also includes distances would have counted twice the number of surfaces. The variation compared to the previous estimate therefore does not show that new roofs have appeared. The result therefore prompts consideration of the existing roofs; feasibility remains to be verified on a building-by-building basis.

Source: SNPA, Report 50/2026, pp. 317 and 319 of the printed edition; pages 318 and 320 of the PDF, notes 71–73.

ASSESSMENT PROCESS

From the gross ceiling to a feasible project

The useful step for a company is to transform a surface on the plan into comparable technical alternatives. The following diagram summarizes the questions to be addressed. Some verifications proceed together and may require revisiting a previous choice.

  1. Detecting the roof

    Which surface actually belongs to the project?

    Reconstructing geometry, properties or availability, existing installations and already scheduled works. The starting point is a site survey, not just the cadastral surface.

  2. Identifying usable spaces

    Where can the modules be placed?

    Consider skylights, shading devices, equipment, paths and spaces necessary for safety and maintenance. The free surface must be compatible with the use of the building.

  3. Check the coverage

    What is needed before installing?

    Evaluate the structure, the pavement, the fixing systems and the waterproofing. Any interventions on the roof are included in the project and the planning of the construction site.

  4. Comparing the configurations

    Which system best serves the company’s needs?

    Link the expected production to the consumption over time, the electrical installation, and the connection conditions. The size does not automatically derive from the remaining square meters.

  5. Defining feasibility

    Which works, conditions and steps remain to be completed?

    Clarify costs, checks, applicable obligations, responsibilities, and timelines. A useful proposal distinguishes the elements that have been confirmed from those that still need to be completed.

Consumption and company objectivesElectrical installation and connection

Qualitative scheme: no surface area, percentage or power calculated for a building.

The checks can proceed in parallel and require revisions of the alternatives.

Original uSolar scheme. The SNPA national method is illustrated separately and is not applied as a calculator to the individual roof.

03 / THE GUIDE

The data to be collected before the offer

To get started, you don't need to have every document already in hand. You need to know what is available, what is missing, and who can retrieve it. An essential dossier links three groups of information.

Building and organization of the works

Prepare floor plans, available structural documents, information about the composition and condition of the roof. Report on any leaks, previous repairs, and materials to be characterized. Also indicate where access can be made and for what periods the activity cannot be interrupted.

Consumption and company objectives

Collect bills, available power levels, and billing profiles, when available. A factory operating on weekdays and a warehouse with continuous loads require different readings. Distinguish measured consumption from future changes already anticipated, noting what is certain and what is still a hypothesis.

Photovoltaics can reduce the energy purchased from the grid while powering loads. To assess this contribution, production and consumption must be compared over the same time intervals; the annual total alone does not describe self-consumption.

Electrical installation and connection

Available electrical schematics, panels, if applicable, and the characteristics of the connection point help to set the comparison. The connection to the grid has its own procedure, with documents and possible works: it should be considered from the outset along with the roof project.

04 / THE GUIDE

If the roof requires work, coordinate the repairs

A renovation project can be an opportunity to evaluate the building and system together. The condition of the roof, fixing systems and water management must be compatible with the chosen photovoltaic solution. Any materials to be removed also require a dedicated process.

This coordination also serves to organize access, lifting, and interference with operations. Any interruptions are evaluated on site: it cannot be promised that the construction site will always be free of any effects on the company’s work. To learn more about the service, consult the page on industrial covers.

Industrial roofing

05 / THE GUIDE

What must make a proposal clear

When comparing offers, check that they describe the same service. Power, roofing work, electrical parts, connection, and utilities can have different scopes. The price per kWp is only useful if you know what is included.

Ask what data support the planned production and the estimate of the self-consumed energy, what costs are included and what conditions remain to be verified. If they are considered evolutions of the activity, they must be recognizable compared to the measured situation.

The SNPA data provides a national perspective. The useful result for your company is a motivated choice regarding its building, with readable assumptions and defined steps.

Photovoltaic on industrial roof

The most frequently asked questions

Can I divide the surface area of my roof by 5 m² and get the installed power?

No. The ratio parameter serves to provide a national estimate for an area that has already been reduced by the model. For each individual building, it is necessary to verify the arrangement of modules, obstacles, shadows, technical spaces, structure, and other project conditions.

The 140–193 GW concern only the warehouses?

No. The figure concerns the residual potential on the roofs of buildings considered in the national model. It should not be attributed entirely to industrial buildings.

Does the report introduce an obligation to install panels on the roof?

No. The value cited is an estimate of the potential, not a new provision. The obligations and responsibilities applicable to each individual project must be verified separately.

Do I have to use all the available coverage?

The available surface area is one of the elements of the project. Before choosing the size, consumption, expected production, energy used or supplied to the grid, costs and connection are compared. It may be useful to evaluate more than one configuration.

Let's start with your barn

Tell us where the building is located, how the company operates, and whether any work is planned on the roof. With the information available, we can set up the comparison and identify the data that needs to be completed to evaluate the photovoltaic system.

Talk to uSolar ↗

Sources and references

×