Photovoltaic construction sites and heat: how to plan the work
The heat in photovoltaic construction sites affects people’s health and the organization of activities. On an exposed roof, scheduling work means assessing weather conditions, physical exertion, access, and the possibility of suspending or rescheduling work.
Published on July 17, 2026
Three points to keep in mind
01
Consider the actual exposure, not just the air temperature.
02
Plan for rescheduling and suspensions in the coordination of the construction site.
03
Check the territory, conditions, and time validity of the ordinances.
01 / In Depth
The air temperature doesn’t tell the whole story
Direct sunlight, humidity, ventilation, warm surfaces, clothing, and the intensity of effort all modify exposure. The assessment therefore cannot be replaced by a single temperature read on the phone or by the feeling of someone on the ground.
Predictive tools, such as those of the WORKLIMATE project, help identify critical situations. They must be integrated into the safety organization of the construction site and interpreted in relation to the actual tasks, the people involved, and the conditions of the place.
02 / In Depth
Programming also means being able to change the program
The sequence of activities can distinguish between exposed workpieces, preparations in protected areas, and interventions that can be carried out in more favorable conditions. Anticipating an activity is not enough if the risk remains high: it is necessary to be able to modify shifts, breaks, and organization, up to suspension when necessary.
The time schedule should make this possibility understandable even to the client. Delivered materials and personnel present are not sufficient reasons to continue a process that is incompatible with safety conditions.
From the forecast to the decision to build
Organizational sequence: planned conditions, actual exposure, feasible measures, decision and updating of the program.
01
Forecasts and current regulations
02
Tasks and exhibition
03
Measures and organization
04
Continue, reschedule or suspend
05
Inform and update
Guidance scheme; decisions entrusted to the competent responsible persons.
No universal time or threshold suggested.
03 / In-depth analysis
The Piedmontese reference for 2026 must be read in its context.
In Piedmont, the summer measures to protect workers exposed to the sun have been extended until September 6, 2026. The regional communication concerns a seasonal measure and the conditions stipulated by the ordinance: it is not a permanent calendar that applies automatically to subsequent years.
By October 27, 2026, that time window is over. What remains are the risk assessment and the obligations applicable to occupational safety. For a new construction site, it is necessary to check the existing acts in the territory and in the affected period, without reusing an old deadline as if it were current.
04 / In Depth
An organizational example, not a universal program
Imagine an intervention involving roofing and pre-assembly in a repaired area. If the forecast indicates critical conditions, the responsible person may consider postponing the exposed work and concentrating the compatible activities in a more favorable window, according to the safety plan.
The example illustrates a decision-making logic; it does not prescribe valid schedules for each team. The availability of a shaded area does not automatically make roof work safe; similarly, a change in duties must be truly compatible with risk management.
05 / In-depth
What to clarify before starting
It is useful to define how changes are communicated, who coordinates the interventions and what conditions can change the sequence of work on the site. Accesses, movements and the availability of areas must also be consistent with the planned organization.
For the client, a serious program is one that explicitly identifies these dependencies. Punctuality is not measured by promising work under any circumstances, but by preparing activities and communications so that unforeseen events can be managed without making spur-of-the-moment decisions.
In the initial comparison, the activities that the client must prepare can also be indicated: access availability, storage areas, and communication with the people present in the building. Clarifying these details prevents a reprogramming of the team from turning into an uncontrolled interference.
The most frequently asked questions
The extension called for was due to expire on September 6, 2026. For subsequent periods, it is necessary to verify the applicable measures, while maintaining the risk assessment.
Not always. Schedules and measures must be chosen based on an assessment of the actual conditions and activities.
Not necessarily. If linked to conditions incompatible with safety, it can be a necessary and foreseen decision in coordination.