News · In-depth analysis

AC and DC charging: choose according to vehicle and parking time

The choice of a charging station depends on the energy to be replenished and the available time. AC and DC describe different architectures: the power written on the station does not automatically correspond to the power that each car can receive.

Published on February 10, 2026

Electric car connected to a wallbox via a charging cable. Original uSolar logo at the bottom right.

Three points to keep in mind

01

Choose the required energy and the duration of the stop.

02

Check the vehicle's limits in addition to those of the station.

03

Distinguish access, payment and power management.

01 / In Depth

Where the electrical conversion takes place

In alternating current charging, AC, the vehicle uses its on-board charger to convert the power to the battery. In direct current charging, DC, the conversion takes place at the station, according to the conditions and limits of the system and the vehicle.

The distinction is more useful than a classification based solely on location. A public station is not necessarily DC and a corporate parking lot can use AC or DC according to the intended service. Not all cars accept the same power or modes.

02 / In Depth

At home, what matters most is the available rest time.

A vehicle parked for many hours may require a different power output than a vehicle that must start up quickly. The choice of a wallbox must take into account the electrical system, power supply, other consumption, and compatibility of the vehicle.

Dynamic power management, if planned and configured, can adapt charging to the available margin. It does not eliminate any supply limitations: if the required time or energy is not compatible, it may be necessary to revise the configuration or available power.

The scheme

The stop counts as much as the power

22 kWh delivered at the point: 2 hours at 11 kW average or 4 hours at 5.5 kW average.

11 kW medium

2 hours

5.5 kW medium

4 hours

Constant average power, ideal example.

Power at the charging point; losses excluding the battery.

It does not represent guaranteed times for a vehicle.

03 / In-depth analysis

More users are involved in the company

Fleets, employees and guests have different schedules and priorities. Number of points, simultaneity, authorizations and management methods must be defined. A card can identify the user without automatically becoming a payment instrument.

For systems with centralized management, protocols such as OCPP allow communication between the station and the platform. Version, functions, compatibility, and included services must be verified: the mere presence of the abbreviation does not guarantee every possibility of control or migration.

Those who manage outages and updates must also be identified. For a site with multiple users, the offer should distinguish between hardware, platform, and recurring services, so as not to confuse the technical availability of a feature with its inclusion in the contract.

04 / In Depth

An example of energy and time

Let’s say we need to transfer 22 kWh to the charging point. With an average effective power of 11 kW, it would ideally take two hours; with 5.5 kW, it would take four. This is an illustrative calculation based on the energy delivered by the point, not the net energy accumulated in the battery.

Losses and the actual power output change the result. In DC charging, the charge status and temperature of the battery also count; a peak power output is not necessarily maintained throughout the entire session. For this reason, a time promised by the nominal value alone can be misleading.

05 / In-depth

Photovoltaic and electrical projects must be coordinated

Solar energy can contribute to charging when available and the vehicle is connected. To capture the surplus, appropriate measures, controls and compatibility are needed; at night photovoltaic production is not available, unless previously accumulated energy is present.

Before purchasing, it is advisable to define the desired service and verify the line, protections, management, and documentation. Home and business can share some technical principles, but they require different paths for the number of users, administration, and operation.

The most frequently asked questions

No. The actual power is also limited by the vehicle, the power supply, the configuration, and the availability of the site.

No. The version, the implemented functions, and the terms of service must be verified.

No. It requires coincidence, available energy, and a complete economic comparison; production is not constant or always present.

×