01
Remodeling
We intervene on the entire coverage or on the portions that require it. The state of support, the spread of degradation, and the lifespan of the materials guide the choice between repair, recovery, and replacement.
Industrial roofing
Repairs, waterproofing and new covers for plants, warehouses and production facilities. We design the roof together with what must be protected and what can be accommodated.
First the problem, then the solution
Industrial roofing must combine structure, water, comfort and access. Let’s start with the real conditions: an infiltration, poorly comfortable premises or a new solar system require different assessments.
01
We intervene on the entire coverage or on the portions that require it. The state of support, the spread of degradation, and the lifespan of the materials guide the choice between repair, recovery, and replacement.
02
Impermeabilization concerns the pavement and its points of contact: connections, skylights, drains and crossings. Reconstructing the path of the water helps to address the cause of the infiltration.
03
We assess the stratigraphy along with the use of the premises, humidity, and thermal behavior. The choice of insulation must also be consistent with the support, installation, and requirements of the project.
04
Materials, slopes, fixings and accessories are coordinated from the outset. The project takes into account the use of the building, maintenance and the possible integration of photovoltaic panels.
Materials and construction details
Sheet metal, sandwich panels and membranes meet different requirements. The choice takes into account the entire composition of the roof, its geometry and the operating conditions.
01
Welded or riveted, it is part of a system that includes supports, fixings and connections. Geometry, surface condition, expansion and condensation management are evaluated, without confusing the metallic coating with the performance of the entire roofing system.
02
The cladding and the insulating core form a composite element. Thermal characteristics, fire behavior, connections, and mounting methods are selected together. The external shape of the panel alone does not describe its performance.
03
Bituminous or synthetic membranes require compatible support and consistent installation details. Slopes, outlets, eaves, and crossings are part of the solution, especially on flat or low-slope roofs.
The performance comes from the whole
The floor covering is the most visible part, but it is not the entire covering. Support, insulation, connections and fixings must work together. That is why we also look at what is beneath the surface.
If photovoltaic panels are planned, the mounting system is included in the same assessment: it is not chosen separately from the roof that supports it.
The design relates possible elements: materials, sequence of layers, steam control and installation details are defined in the project.
01
The mounting system transfers the actions to the intended supports and must respect the pavement.
02
Valves, connections and crossings must be verified together with the layout of the system.
03
Materials and installation are evaluated for thermal behavior, humidity, and fire safety requirements.
04
The state and the load-bearing capacity guide the feasibility and any necessary works.
The construction site in the life of the company
Production, goods, people and means have routes and schedules to be respected. Planning takes into account the surrounding areas, access points, facilities and possible interference.
When the context allows, it is possible to study processes for specific areas or phases. Timings, protections and any suspensions depend on the individual intervention.
If asbestos is present, removal is carried out according to a dedicated procedure with qualified personnel. The mere observation of a corrugated sheet does not identify its composition.
Covering and energy
Before installing the modules, we assess the conditions and expected coverage duration. Re-installing and preparing it in the same project can avoid subsequent removal of the system, when the solution is technically and economically consistent.
Loads, fixings, sealing and access are part of the checks. The installable power and the expected production are evaluated based on the plant design.
Links between technical inspections and the design of the roofing and the system.
Fire prevention and system configuration
When a roof must accommodate a photovoltaic system, waterproofing and insulation must be evaluated along with the rest of the project. The complete stratigraphic structure, the fire behavior of the materials, the fixing systems, and the configuration of the modules all count.
Before choosing the solution, we reconstruct the existing layers: material and thickness of the insulation, membranes, support, and available documentation. The declared performance must refer to the package and the relevant operating conditions. The outer sheet alone does not describe the behavior of all the underlying layers.
For activities subject to fire control inspections, the 2025 Fire Department guideline updates the criteria to be considered: characteristics of the cover and system, access, paths and separations from skylights and smoke and heat extractors. The solution depends on the building and risk assessment, with documented performance for the intended installation conditions.
The BROOF classification, the fire resistance EI 30 and the A1 reaction class describe different aspects: they are not interchangeable terms. Therefore, the verification concerns the entire roofing-photovoltaic system. The roof renovation is not an automatic consequence of the new guideline: it is a choice that must be justified based on the condition of the roof and the needs of the project.
The uSolar method
We relate the works on the roof to the company’s energy objectives. A readable roadmap clarifies what to accomplish, which checks to complete, and how to organize the activities.
01
We collect observed conditions, building usage, photographs, and available documents. We identify critical issues and areas for further investigation.
02
We relate materials, construction details and the required performance. The proposal clarifies the planned works and aspects that still need to be verified.
03
We define phases, accesses, and interferences with the underlying activities. Any suspensions are evaluated and agreed upon on a case-by-case basis.
04
The course is completed with the controls and documents required for the intervention, along with useful instructions for use and maintenance.
Before you start
From the state of the roof to the integration of photovoltaic panels, the points to clarify about your building.
No. The choice depends on the state of the support, the distribution of problems, and the compatibility of the interventions. A technical assessment distinguishes between local repairs, partial refits, and complete replacements.
The decision is not based solely on the insulation designation. The guide includes several evaluation paths, including the behavior of the panel-cover system in a verified configuration. Even an externally flameproof sheet alone does not demonstrate the performance of all the underlying layers.
No. It does not introduce a general requirement to replace any existing roofing before installing photovoltaic panels. It is necessary to verify the condition of the roof, its composition, the documented performance, and the design of the system. The necessary work may vary from one building to another.
On its own, it does not demonstrate the suitability of the entire system. It describes the behavior of the cover exposed to an external fire under the conditions provided for by the classification. The modules themselves, their coupling with the roof, the fasteners, and the other measures required by the project must also be verified.
It is evaluated based on the processes and the risks of interference. The planning may include separate areas or phases; any stops and protections are defined for the specific intervention, without promising an always possible continuity.
Location, use of the building, indicative dimensions, available photographs and observed criticalities. Drawings, documentation of the roof and information about any photovoltaic system help to set the assessment.
Tell us about the building, the critical issues you observe, and what you want to achieve. We will start with this information to define the necessary checks and the areas that need further investigation.
We use cookies to improve your experience on our site. By using our site, you consent to the use of cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper functioning of the website.
These cookies are required for adding comments to this website.
Statistics cookies collect information anonymously. This information helps us to understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyses website traffic for informed marketing decisions.
Service URL: policies.google.com (opens in a new window)
Puoi trovare maggiori informazioni nella nostra Privacy Policy and in our Privacy Policy.